模具工艺及加工时间:


ProductionProduction cycleMaterialsTechnical process
General mouldAbout 30 days

Irregular mold(Common type)50  days

Irregular mold(Special type)60~70 days


Circular cutter15 daysDC53,SKD11,Cr12MovDigital controlled lathe,Internal and external circular grinding, Lower cutter is reversed
Cutter plate15 days45#Steel plateBore a hole,Drill vent,Electroplating
Common cavity10 daysAluminium barDigital controlled lathe,Drill vent,Polishing
Special process cavity20 days~25 daysAluminium barAdd to:Carving、Corrosion、Sand blasting, and so on
Top head7 daysCopper, aluminum, Aluminum with hard oxygenDigital controlled lathe,Carving,Drill vent,Polishing
Stretch head5 daysImported nylon rod, Sai Steel, HeidakDigital controlled lathe,Polishing,Special-shaped needs to be carved
Top shaft、Stretch shaft、Limit lever5 daysHard chrome axisDigital controlled lathe,Milling,Drill vent